OPTIMIZE THE OPERATING MODE OF THE QUARRY DRAINAGE INSTALLATION.
DOI:
https://doi.org/10.5281/zenodo.8026905Abstract
Drainage plants of mining enterprises, as a rule, were laid several years ago. Currently, pumps are installed for drainage, selected during the design with the values of maximum or normal inflows specified at the time of the construction of the mine or section, as well as the values of the lift height. During operation, the water inflow indicators inevitably changed, but the pumps remained the same. In connection with the foregoing, there is a need for a verification calculation of the dewatering installation for the parameters that are currently in effect.
References
Bondaletova Lyudmila Ivanovna, Bondaletov Vladimir Grigorievich “INDUSTRIAL ECOLOGY” of Tomsk Polytechnic University -2008.
A.P. Grishko “Stationary machines” volume 2 “Mine drainage, fan and pneumatic installations” Moscow, Gornaya kniga publishing house, 2007.
Dolganov A.V. Stationary machines: textbook / A.V. Dolganov. - M.: Publishing house of the Academy of Natural Sciences, 2017. - 281 p.